Skip to content

Managed Production in Zhuji OEM / ODM & Private Label Flexible MOQ Programs

Worldwide Shipping Support EN

PRODUCTION PROCESS

How Custom Grip Socks Move Through Production

Follow the product from specification and yarn preparation through knitting, branding, grip application, finishing, inspection and packing.

PROCESS CONTROL

Each stage depends on the approved specification

The process route changes with construction, logo method, grip design and packaging, but approval and traceability remain important.

01

Programming and knitting

Prepare the construction, yarns, size information and artwork inputs needed for knitting and initial workmanship review.

02

Branding and grip application

Complete applicable embroidery, print or other brand processes and apply the approved sole-grip design.

03

Finishing, inspection and packing

Finish the product, verify key requirements, pair and label goods, then pack according to the order.

DOCUMENT THE METHOD

Typical production checkpoints

Results are meaningful only when the sample, conditioning, procedure, units and acceptance criteria are identified.

Pre-productionApproved sample, specification, materials, artwork and packaging proof
Knitting stageConstruction, dimensions, colors, logo placement and workmanship
Grip stagePattern, position, coverage, color and application consistency
Packing stageAssortment, labels, barcode, quantity and carton marks

TECHNICAL FAQ

Questions about the manufacturing process

Is every step performed in one building?

Not necessarily. The relevant processes are coordinated through specialized partners according to the project route.

Can buyers receive production updates?

The reporting scope and checkpoints can be agreed for an active order.

Map the right production route for your product

Tell us the product, market and evidence you require so the project can be reviewed against a defined specification.

Discuss Requirements